- 01
Pick your dig date
Choose the day work will begin.
- 02
Set the notice period
Use your state’s requirement. We start with three working days.
- 03
Skip holidays
The tool counts working days only.
- 04
Print the checklist
Take it with you on dig day.
About this tool.
Is this legal advice?
No. Notice periods differ by state and can change. Always confirm with 811 when you call.
Does 811 mark private lines?
No. Private lines beyond the meter are the owner’s responsibility.
Related services.
C-06TrenchlessUtility Locating & 811Requesting locates, walking the marks, reviewing plans and mapping private lines so excavation starts with a clear picture of what is buried.Surface work
C-05TrenchlessVacuum ExcavationNon-destructive digging with air or water and a vacuum truck to expose buried utilities safely, confirm depth and prevent line strikes.Shallow trench
B-01ExcavationExcavation ContractorFull-service excavation for building pads, basements, utilities, drainage and site work, planned around locates, soil and safe digging practice.Deep excavationCall 811. Then call us.
Tell us what you are building, fixing or draining and we will suggest a site visit and a plan. The lines get located before the bucket moves.