Subdivision and Developer Utilities, explained.
A subdivision multiplies every utility problem. There are dozens of lots, miles of pipe, many structures and a long chain of inspections and acceptance steps. A mistake in the first street gets repeated in the last.
We build the underground infrastructure in the order the development needs: clearing and rough grade, sewer and storm first, then water, conduit and street base. We keep stub-outs for each lot marked and documented, support the engineer’s inspections and work to hand over streets that are ready for curb and paving.
Signs this service fits
- A developer is building a new residential community
- A phase of an existing subdivision is being added
- A builder needs lots serviced before a model home
- Streets need base prepared for paving
A good fit, and what to know.
We would rather you hear the limits from us than discover them later.
A good fit when
- Plans and phasing are available
- A reliable underground contractor is needed for several phases
- The site will need erosion control and haul-off
Worth knowing
- Large developments need engineering and approvals before digging
- Weather and inspections can slow a phase
Why do it this way.
Phase by phase
Work follows the development’s schedule.
Marked lot stubs
Each lot’s connection point is surveyed or tied off.
Erosion control
Controls are maintained through the build.
Documented
Photos and records support acceptance.
From first look to finished ground.
A clear sequence for every job.
- 01
Review the development plans
Phasing, utility layouts, lot stubs and inspections are laid out with the developer.
- 02
Clear and grade
Streets and lots are cleared and rough graded, with erosion control in place.
- 03
Install the lines
Sewer, storm, water and conduit are installed with structures and lot stubs.
- 04
Document and hand off
Stubs are marked, tests recorded and streets prepared for base and paving.
Services that go together.
E-02ProjectsCommercial Site UtilitiesUnderground water, sewer, storm, fire protection and conduit for commercial pad sites, built to plan and scheduled with the general contractor.Deep excavation
A-10Utility LinesManholes & Catch BasinsPrecast manholes, drop inlets and catch basins set on prepared bases and tied into sewer and storm lines on development and commercial sites.Deep excavation
A-09Utility LinesForce Mains & Lift StationsDeep excavation, wet well setting and pressure sewer pipe installation for pump stations and force mains on developments and private sites.Deep excavation
B-13ExcavationErosion ControlSilt fence, wattles, construction entrances, matting and seeding to hold disturbed soil in place during and after construction.Surface workRead more on this topic.
How to Compare Excavation BidsA fair way to line up different proposals and spot what is missing.2 min read
Timeline for a Utility Installation ProjectThe stages from first call to finished lot, and what slows each one down.2 min read
What Affects the Cost of Utility WorkThe factors that move a price up or down, so you can compare bids on equal terms.2 min read Subdivision Utilities FAQ.
Do you work for developers directly?
Yes. We work with developers, engineers and builders on phased infrastructure.
Can you handle just part of the infrastructure?
Yes. We can take a single utility, a phase or the full underground package depending on the project.
What about inspections and acceptance?
Utilities and the municipality inspect and accept the work. We schedule around them and keep records for the handoff.
Subdivision Utilities across Middle Tennessee.
Pick your city for its page.
Call 811. Then call us.
Tell us what you are building, fixing or draining and we will suggest a site visit and a plan. The lines get located before the bucket moves.