Underground utility and excavation work in Middle Tennessee
GLOSSARY

Underground Utility and Excavation Glossary

53 terms in plain English, from 811 and bedding to thrust blocks and wet wells.

  • 53 terms

#

811
The national number to call before you dig, which connects you to your state’s one-call center so utilities can mark their buried lines.

A

APWA color code
The standard set of colors used for utility marking paint and flags, such as red for electric, yellow for gas and blue for water.
As-built
A drawing that records where utilities and structures were actually installed, which can differ from the original plan.
Auger boring
A trenchless method that pushes steel casing through the ground while an auger inside removes soil, also called jack and bore.

B

Backfill
The soil or stone placed back into an excavation after pipe or conduit is installed.
Bedding
The layer of sand or crushed stone placed under and around a pipe to support it evenly.
Belly
A low spot or sag in a sewer pipe where water and solids collect instead of draining.
Benching
Cutting the sides of an excavation into steps to keep the walls stable and safe.
Bentonite
A clay used in drilling fluid for directional drilling to stabilize the hole and carry cuttings out.
Boring pit
The entry or receiving pit dug at either end of a trenchless crossing.

C

Catch basin
A drainage structure with a grate that collects surface water and sends it into a storm pipe.
Cleanout
A capped access point on a sewer line that allows inspection and clearing.
Compaction
Making soil denser by mechanical force so it does not settle later.
Competent person
A person who can identify excavation hazards and has authority to correct them, required on trench sites under safety rules.
Conduit
A pipe or tube that protects electrical or communications cable underground.
Cubic yard
A volume of 27 cubic feet, the common unit for measuring soil, stone and concrete.
Culvert
A pipe or tunnel that carries water under a road, driveway or embankment.

D

Dewatering
Removing water from an excavation with pumps or sumps so work can continue.
Directional drilling
A trenchless method that steers a drill bit along an underground path and pulls pipe or conduit back through the hole.
Drain field
The part of a septic system where treated liquid soaks into the soil.
Duct bank
A group of conduits encased together in the ground, often in concrete.
Ductile iron
A strong iron pipe material used for water mains and fire lines.

E

Easement
A recorded legal right for a utility or other party to use part of a property for a specific purpose.

F

Force main
A pressurized sewer pipe that carries wastewater from a pump station to a higher point.
French drain
A trench with filter fabric, stone and perforated pipe that collects and carries away groundwater.

G

Grade
The slope or elevation of the ground or a pipe.
Gravity sewer
A sewer that works by sloping downhill without pumps.

H

Handhole
A small underground box that gives access to conduit and cable at intervals.
HDPE
High-density polyethylene, a flexible plastic pipe used for conduit, water, gas and trenchless installations.

I

Invert
The inside bottom of a pipe, whose elevation is used to set grade.

J

Jack and bore
Another name for auger boring under roads, using steel casing.

L

Lateral
The smaller pipe that connects a building to a sewer main.
Lift
A layer of backfill placed and compacted before the next layer goes in.
Lift station
A pump station that lifts wastewater to a higher elevation when gravity cannot carry it.
Locate
The marking of buried utilities on the ground after an 811 request.

M

Main
A large utility pipe, usually in the street, that serves many properties.
Manhole
A vertical access structure on a sewer or storm line, with a removable cover at the surface.

P

Pothole
A small hole dug to expose and verify a buried utility.
Precast
Concrete structures made in a factory and delivered to the site, such as manholes and vaults.
Protective system
Sloping, benching, shoring or a trench box used to keep trench walls from collapsing.

R

Right-of-way
Land used for a road or utility, where permits are usually needed to dig.
Riser
A vertical pipe or access that brings a buried component, such as a septic tank, to the surface.

S

Shoring
Supports installed in an excavation to hold the walls in place.
Spoil
Soil removed from an excavation.
Stub-up
The end of a pipe or conduit left sticking up above grade for later connection.
Swale
A shallow channel that carries surface water across a lot.

T

Tap
The connection of a service line to a utility main.
Thrust block
A concrete mass poured against a pipe fitting to resist the force of pressurized water.
Tracer wire
A wire buried with plastic pipe so a locator can find it later.
Trench box
A steel shield placed in a trench to protect workers.

V

Vacuum excavation
Digging with air or water and a vacuum to expose buried lines without damaging them.

W

Warning tape
Colored tape buried above a line to warn future diggers.
Wet well
The underground chamber of a lift station where wastewater collects before it is pumped.

Call 811. Then call us.

Tell us what you are building, fixing or draining and we will suggest a site visit and a plan. The lines get located before the bucket moves.

Request a quote

Call 811. Then call us.

Tell us what you are building, fixing or draining and we will reply with a suggested site visit and a plan. The lines get located before the bucket moves.

Prefer to talk? Call us(615) 393-6985
  • Locates coordinated before any digging
  • Options explained, including the ones that cost more or less
  • The scope and price explained before work begins

Request your quote

We read every request and reply with a suggested next step.

Your details go straight to our team and are never sold. Prefer to talk? Call (615) 393-6985.

CallGet a Quote