Jack and Bore vs HDD
GUIDE · Boring and Trenchless · 2 min read

Jack and Bore vs HDD

Two trenchless crossing methods and how they differ in materials, grade and cost.

The short version

  • Jack and bore pushes steel casing in a straight line
  • HDD steers flexible pipe on a curved path
  • Jack and bore suits gravity pipe and heavy crossings
  • HDD suits long crossings and conduit

How each works

Jack and bore, also called auger boring, pushes a steel casing pipe through the ground from a launch pit while an auger inside removes the soil. The casing follows a straight line at a set grade.

HDD drills a steerable pilot hole and pulls flexible pipe back through it.

Straight vs curved

Jack and bore is straight and tightly controlled. It is the right tool when a casing must be installed to a precise grade, such as for a gravity sewer or when a regulator demands a steel casing.

HDD can curve under obstacles and drill much longer distances.

Pits and equipment

Jack and bore needs a larger launch pit with shoring and a track to push from. HDD needs smaller pits and a rig on the surface. Space, depth and access influence which one fits.

Both avoid cutting the road.

Choosing

Roads and rails with strict requirements often call for jack and bore. Long conduit and pressure pipe runs favor HDD. A designer or utility may specify the method, and we recommend based on the soil and the route.

When rock is present, either may need an alternative approach.

General information, not engineering, legal or safety advice. Rules and requirements vary by utility, city and county.

Questions

About this topic.

Which is cheaper?

It depends on length, diameter, depth and soil. HDD is often cheaper for small, flexible pipe, and jack and bore for large, rigid casing.

Can a road owner require one over the other?

Yes. Highway and railroad owners often specify the method and casing, and we follow their requirements.

Call 811. Then call us.

Tell us what you are building, fixing or draining and we will suggest a site visit and a plan. The lines get located before the bucket moves.

Request a quote

Call 811. Then call us.

Tell us what you are building, fixing or draining and we will reply with a suggested site visit and a plan. The lines get located before the bucket moves.

Prefer to talk? Call us(615) 393-6985
  • Locates coordinated before any digging
  • Options explained, including the ones that cost more or less
  • The scope and price explained before work begins

Request your quote

We read every request and reply with a suggested next step.